Area measurement verification at critical stages can avoid costly delays & rework

by Peter Folwell, Director - Plowman Craven

Through every stage of the build lifecycle there are ongoing verification and clash detection checks to establish whether tolerances are being met and construction is meeting design. Director Peter Folwell examines whether the floor area ramifications of design changes or positional differences are being considered.

Through every stage of the build lifecycle there are ongoing verification and clash detection checks, each establishing whether tolerances are being met and construction is meeting design. If there have been design changes or positional differences are the floor area ramifications being considered?

It can all start at the original design stage where you need to fully understand your baseline floor areas – this is critical in establishing your required targets and can assist in contract agreements.

Collaborating with all stakeholders at the time, agreeing the code (RICS Sixth Code or IPMS), optimising design, having an independent assessment – these all are part of establishing your starting point and the floor area in order to enable comparison during construction and through to practical completion.

As each build stage approaches, we feel is imperative to have dimension and area checks at each critical point in the programme. It might be at topping out, shell & core or practical completion. If at these stages any differences are reported it provides an early warning and can avoid costly delays or major reworks.

Having a measurement surveying company carry out the checks would provide a level of independence plus a consistency in approach. There is also the added aspect that they would be looking at those elements that would directly affect the floor areas. For example, if the floor system installation is out of tolerance this could affect whether full height glazing is included within the area totals.

We are increasingly being involved in this verification exercise and are currently on a number of high-profile build projects providing both consultancy and a CAD assessment at the design stage, critical checks through construction and confirmation of floor areas at practical completion.

What next?

If you're interested and want to know more about area measurement verification then please get in touch...

Peter Folwell

About the Author…

Peter Folwell, Director

A respected name in property measurement, Peter’s industry standing and strategic relationships with key clients has helped to establish Plowman Craven as a leading player in the fields of Area Referencing and BIM. Peter delivers consultative advice, workshops and presentations to real estate professionals and is established as one of the leading experts in the application of International Property Measurement Standards (IPMS).

01582 765566 webenquiry@plowmancraven.co.uk

More from Peter Folwell…

Higher-Risk Residential Buildings: The need for accurate height measurement

All higher-risk residential buildings in the UK need to be registered with the Building Safety Regulator before 1st October 2023 by the principal accountable person. So, what exactly determines a higher-risk building?…

Read Article

How technology revolutionised the world of surveying

As the full effect of the pandemic is starting to play out, businesses and industries are having to re-align to understand how they will approach the future. It is no surprise the use and reliance on technology has accelerated exponentially and ...…

Read Article

The Office - still a good investment post COVID-19?

With the second major lockdown in place and control of COVID019 not markedly improving, is the death of the office really the case? Our Director, Peter Folwell, offers his thoughts...…

Read Article